Sign In, Renew, Sign Up

Search AIA

Search AIA Go

Contract DocumentsContract Documents

Page Tools

Reed Construction Data

Advertisements

A201™–2007, General Conditions of the Contract for Construction
The general conditions are an integral part of the contract for construction for a large project and they are incorporated by reference into the owner/contractor agreement. They set forth the rights, responsibilities, and relationships of the owner, contractor, and architect. Though not a party to the contract for construction between owner and contractor, the architect participates in the preparation of the contract documents and performs construction phase duties and responsibilities described in detail in the general conditions. AIA Document A201™–2007 is adopted by reference in owner/architect, owner/contractor, and contractor/subcontractor agreements in the Conventional (A201) family of documents; thus, it is often called the “keystone” document. NOTE: A201–2007 replaces AIA Document A201™–1997 (expired May 31, 2009).


Ready to purchase?

Unlimited Documents


Document Essentials Bundles


AIA Documents-on-Demand® Plus

Edit, manage and finalize all 180+ AIA contracts and forms for one full year

Unlimited access to the most commonly used contracts based on your industry type.

Purchase and edit one AIA document or form at a time.

Don’t need to edit documents? Purchase through AIA Documents-on-Demand®.

 

Footer Navigation

Copyright & Privacy

  • © The American Institute of Architects
  • Privacy