Documents Synopses by Family
CM Constructor Family
The documents listed in these synopses are
organized according to their family, a system of classification
that refers to the type of project or project delivery
method.
CM Constructor
Family
A121CMc2003
Standard Form of Agreement Between Owner and Construction Manager
Where the Construction Manager is also the Constructor (AGC
Document 565)
A121CMc2003 is intended for use on projects where a
construction manager, in addition to serving as adviser to the
owner, assumes financial responsibility for construction of the
project. The construction manager provides the owner with a
guaranteed maximum price proposal, which the owner may accept,
reject, or negotiate. Upon the owner's acceptance of the proposal
by execution of an amendment, the construction manager becomes
contractually bound to provide labor and materials for the project.
The document divides the construction manager's services into two
phases: the preconstruction phase and the construction phase,
portions of which may proceed concurrently in order to fast track
the process. A121CMc2003 is coordinated for use with
A2011997, General Conditions of the Contract for
Construction, and B1511997, Standard Form of Agreement
Between Owner and Architect.
A131CMc2003
Standard Form of Agreement Between Owner and Construction Manager
Where the Construction Manager is also the Constructor and Where
the Basis of Payment is the Cost Plus a Fee and there is no
Guarantee of Cost (AGC Document 566)
Similar to A121CMc1991, this CM as constructor
agreement is intended for use when the owner seeks a construction
manager who will take on responsibility for providing the means and
methods of construction. However, in A131CMc2003 the
construction manager does not provide a Guaranteed Maximum Price
(GMP). A131CMc2003 employs the cost-plus-a-fee method,
wherein the owner can monitor cost through periodic review of a
control estimate that is revised as the project proceeds. The
agreement divides the construction manager's services into two
phases: the preconstruction phase and the construction phase,
portions of which may proceed concurrently in order to fast track
the process. A131CMc2003 is coordinated for use with
A2011997, General Conditions of the Contract for
Construction, and B1511997, Standard Form of Agreement
Between Owner and Architect.
Back to Document
Families
|
|