The U.S. Department of Veterans Affairs Palo Alto (VAPA) Polytrauma and Blind Rehabilitation Center

Architect: SmithGroup and The Design Partnership LLP

Owner: U.S. Department of Veterans Affairs

Location: Palo Alto, California

Category B: Built: More than $25 million (construction cost)

The new VA Palo Alto (VAPA) Polytrauma and Blind Rehabilitation Center is one of only five polytrauma centers in the country designed specifically to serve and enhance the patient rehabilitation experience of polytrauma, blind and visually impaired veterans. At 174,000 square feet, it is not only the largest federal rehabilitation facility but also the only center to house polytrauma and blind rehabilitation services under one roof.  

The Center’s impactful approach to healing through design—where the environment itself is a tool for rehabilitation—provided the design team provided the team with multiple opportunities to improve the patient experience by designing for our senses—touch, movement, smell, taste, sight, hearing and balance. The evaluation of each design element against these human sensory metrics resulted in a more immersive and healing space for patients, staff and visitors alike.  The Polytrauma and Blind Rehabilitation Center exemplifies equity by design—minimizing barriers that patients face to maximize the potential for successful rehabilitation. The design integrates the latest advances in accessibility, universal design, and rehabilitation practices, resulting in a healthcare facility that aims to not only enhance patient recovery during their rehabilitation journey but long after.

"There is a consistency throughout in the planning, intent, delivery and resolution of the architecture. The result is powerful and resourceful given the tight budget." ~ Jury comment

How this project improves patient healthcare

Our design approach focuses on the seven sensory processing rehabilitation concept, emphasizing and integrating humans’ basic learning processes into rehabilitation program. Image: SmithGroup

The Rehabilitation Center houses 24 polytrauma rehabilitation beds, 32 blind rehabilitation beds, and 12 polytrauma transitional rehabilitation beds. To create a more healing experience, the polytrauma patient rooms feature an abundance of natural light and non-institutional materials. A seamless transition between all materials ensures that surfaces require minimal effort to negotiate. Railings circling the corridors encourage movement, but the building also encourages ‘mobility without crutches,’ balancing accessibility with real-world conditions. Each design feature reinforces and supports the physical and occupational therapy and training. Staff performance was another important consideration. Our designers worked closely with staff to determine their unique needs, resulting in the clarification and enhancement of circulation systems, the creation of calming spaces for patients and staff, and a flexible modular approach to better address future changes in rehabilitation practices. With staff guidance, our design team embraced functional, impactful design solutions in lieu of overstimulating decor and amenities.

Additional information

Project attributes

Construction cost or anticipated construction cost: $600 million

Building area or anticipated building area: 174,000 sq ft

Construction start date or anticipated construction start date: October 2011

Substantial completion date or anticipated substantial completion date: November 2020 (estimated)

Project team

Acoustics: Charles M. Salter Associates, Inc.

Engineer - Civil: BKF Engineers

Engineer - Electrical: Guttmann & Blaevoet | Cammisa + Wipf

Engineer - Mechanical : Capital Engineering Consultants, Inc.

Engineer - Plumbing: Capital Engineering Consultants, Inc.

Engineer - Structural: Degenkolb Engineers

Geotechnical: Treadwell & Rollo, a Langan Company

Interiors: SmithGroup

Landscape Architects: Keller Mitchell & Co. | Royston Hanamoto Alley & Abey

Planning: SmithGroup        

Signage: Kate Keating Associates  

Technology: TEECOM

Jury

Marlon Blackwell, FAIA (Chair), Marlon Blackwell Architects, Fayetteville, Arkansas

Vincent Della Donna, AIA, Jackson, New Jersey

Brian Uyesugi, NBBJ, Seattle, WA

Sunil Shah, Kaiser Permanente, Oakland, California

Jim Henry, AIA, CallisonRTKL, Dallas, TX

Jocelyn Stroupe, CannonDesign, Chicago, IL

James Childress, FAIA, Centerbrook Architects, Centerbrook, Connecticut

Image credits

Marielle Neri - 3_Central Court Rehabilitation Garden

Tim Griffith and Kyle Jeffers

The U.S. Department of Veterans Affairs Palo Alto (VAPA) Polytrauma and Blind Rehabilitation Center-04

Tim Griffith and Kyle Jeffers

The U.S. Department of Veterans Affairs Palo Alto (VAPA) Polytrauma and Blind Rehabilitation Center-03

Tim Griffith and Kyle Jeffers

The U.S. Department of Veterans Affairs Palo Alto (VAPA) Polytrauma and Blind Rehabilitation Center-06

Tim Griffith and Kyle Jeffers

The U.S. Department of Veterans Affairs Palo Alto (VAPA) Polytrauma and Blind Rehabilitation Center-05

Tim Griffith and Kyle Jeffers